Surface Preparation:
Surfaces must be dry and free of dust, dirt, grease, oil, mold release materials or other contaminants. For best results, temperature of adhesive should be at least 65°F (18°C).
Application
Porous Surface: Brush, spray or flow an even coat of adhesive to both surfaces. Very absorbent materials may require more than one coat. Bond while adhesive is tacky. Join surfaces with firm pressure.
Non-Porous Surface: Brush, spray or flow an even coat of adhesive to both
surfaces. To achieve a satisfactory bond, adhesive must be force dried @ 180°F
(82°C). Bond with firm pressure while warm.
Drying Time:
Drying time depends on temperature, humidity, air movement and porosity of the materials bonded. When brushing, wait a minimum of 10 minutes. Bonds can be made up to 60 minutes. Sprayed bonds may be made almost immediately and up to 60 minutes.